Transneft- Druzhba increases the throughput capacity of the BTS-2 oil pipeline to 36 million tons.
Edited by Rhod Mackenzie / 2017-04-26 06:47:00
Transneft-Druzhba increased the capacity of the first launch complex of the Baltic Pipeline System (BPS-2) commissioned in 2012.