In February, Rimera to dispatch 100 tons of bends for Transneft’s oil pipelines
In February, the Chelyabinsk plant SOT, a part of Rimera, will supply 115 hot bends (100 tons) for the construction and upgrade of the main oil pipelines of Transneft’s subsidiaries – Vostoknefteprovod and Sibnefteprovod, Rimera reports.
The most part of February dispatches for Transneft is hot bends with diameter of 720 mm and wall thickness of 12 mm. The products are intended for the construction of the main oil pipeline Kuyumba-Taishet. “In 2014, this is strategic project for Rimera in terms of supply of main pipeline equipment,” – the company notes. Besides, Rimera will supply hot bends with diameter of 1020 and wall thickness of 14 and 16 mm to Transneft.