In February, Rimera to dispatch 100 tons of bends for Transneft’s oil pipelines

In February, the Chelyabinsk plant SOT, a part of Rimera, will supply 115 hot bends (100 tons) for the construction and upgrade of the main oil pipelines of Transneft’s subsidiaries – Vostoknefteprovod and Sibnefteprovod, Rimera reports.

The most part of February dispatches for Transneft is hot bends with diameter of 720 mm and wall thickness of 12 mm. The products are intended for the construction of the main oil pipeline Kuyumba-Taishet. “In 2014, this is strategic project for Rimera in terms of supply of main pipeline equipment,” – the company notes. Besides, Rimera will supply hot bends with diameter of 1020 and wall thickness of 14 and 16 mm to Transneft.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer