Facilities of Transneft – the Far East are ready for autumn-winter period
Edited by Rhod Mackenzie / 2016-10-11 05:32:14
The facilities of the second stage of the Eastern Siberia - Pacific Ocean (ESPO-2) oil pipeline have been prepared for stable work in the autumn-winter period, as well as during the spring flo