Transneft-Siberia puts into operation Surgut-Gorky-Polotsk oil pipeline sections

Surgut directorate of Transneft - Siberia trunk pipeline connected 2 of 5 sections of a linear part of Surgut - Gorky – Polotsk oil pipeline.

According to Transneft, operation on the replacement of pipes at 5 sections of Surgut - Gorky - Polotsk pipeline began in November 2015,

To date, two sections have been connected to the main pipeline system (Surgut region and Khanty-Mansiysk Autonomous area).

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer