In August Tyumen metallurgical plant might produce 45 thousand tons of rolled products a month
Edited by Rhod Mackenzie / 2014-07-31 06:03:10
The Tyumen metallurgical plant plans to reach itse full capacity – 45 thousand tons of metal rolled products a month – in August in 2014. The first steel was produced at the plant “Electrosteel of Tyumen” a year ago – in late July 2013. For the first year the plant mastered the production, studied the sales markets. Now the main goal is to reach the 100% project capacity, start the mastering of the fabricated shapes, the interlocutor said. From the beginning of the year the plant produced more than 110 thousand tons of products.