VMZ announces its industrial results in the first 9 months of 2014

In January-October 2014, Vyksa metallurgical plant produced 1.3 million tons of pipe products, which is by 10% higher than in the same period of the previous year. The production of large-diameter pipes increased by more than 20% to 740 thousand tons.

In the reporting period, the production of railway wheels decreased by 36% as compared with the same period of the previous year to 343 thousand wheels. In the reporting period, the production of rolled steel plate amounted to 464 thousand tons, which is by 12% higher than in the first nine months of 2013.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer