KAZ Minerals expects the output of first copper at Aktogay until the end of the year

The start of cathode copper production is planned for Q4 2015.

KAZ Minerals group, the largest copper producer in Kazakhstan, expects the production of first copper at the Aktogay deposit to start in 2015.

The extraction of oxidized ore goes on at the Aktogay deposit. As of the end of September, 2.13 mln tons of ore with copper content of 0.37% were unloaded at the first two heap leaching panels out of 9. On September 26th ore watering with acid started. Currently the construction of the objects for processing of oxidized ore by liquid extraction and electrolysis goes on.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer