“Polyus Gold” received power transmission line project

JSC “DVEUK” (Far-Eastern Energy Holding company) transferred HV line construction project for Yano-Kolyma gold ore province in Magadan region to the subsoil user of the Natalka gold ore deposit JSC “RiM” (part of PJSC “Polyus”), is stated in the press-release of the company.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer