Rimera increased transporting equipment dispatch to Transneft

Last year the supplies of the joint details of SOT plant and reinforcement made by the Czech MSA for Transneft increased by several times.

In 2013, the Chelyabinsk SOT dispatched to Transneft 3,664 tons of its product, by 2 times more than in 2012 (1,785 tons). Most of the supplied products were hot and cold bending branches in cover PPU 100-OC, 75-MP and 100-MP for stages 2 and 3 of Zapolyarye – Purpe pipeline system.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer