Seamless pipes to be produced on the basis of Uzbek metallurgical plant

​On the basis of the Uzbek metallurgical plant it is planned to found the first in the country production of seamless hot deformed pipes.

At the first stage the Uzbek metallurgical plant will produce up to 0.1 mln tons of new products a year. The project capacity of the complex is 0.28 mln tons of pipes a year.

The planned period of the construction start is 2017. The completion of construction is planned for 2020.

The investor is the Chinese company Tianjin Ring-Top Petroleum Manufacturing.

Uzbek metallurgical plant also plans to organize the production of ferroalloys (ferrosilicon – until 2017, ferrosilicon manganese –until 2018), steel wire ropes (2016-2017), rod wire at the mill -300 in the sort-rolling shop #2 (2016-2018).

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer