Uralelectromed upgrades copper powder plant
Edited by Rhod Mackenzie / 2014-05-27 01:59:17
Uralelectromed upgrades a technological line at the copper powder plant costing 20 million rubles. The new equipment will meet the demands of the modern production and will improve labour conditions. Uralelectromed makes copper powder with the use of electrolysis method, and then the product passes through several technological stages.