In January – September, MMK Group reduced steel production by 10%

In January – September, MMK Group reduced production of steel by 10% to 9.027 million tons, and trade metal items by 9% to 8.309 million tons.

In Q4, trade metal items yield is going to remain at the level Q3. Steel production in Q3 reduced by 7% to 2.874 million tons, and trade metal items yield reduced by 7% to 2.640 million tons, due to the planned repairs of the blast furnace in Magnitogorsk, and full stop of production capacities at MMK Metalurji while the strike.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer