Engineering survey for ore mining and dressing plant project on the base of Pavlovskoye deposit to be completed in 2017

The engineering survey for designing and construction of mining and processing plant on the base of the northermost deposit of lead-zinc ore in Russia Pavlovskoye is planned to be completed in 2017

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer