Polymetal commissioned power transmission lines for 6 billion rubles. to the Nezhda field

Polymetal put into operation a 110 kV Khandyga-Nezhdaninskoye transmission line with a length of 254 km. It will feed the production site of the Nezhdaninskoye field.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer