In 2020 "Aldanzoloto Mining" to increase production of Kuranakh gold by 1.6 times.
Edited by Rhod Mackenzie / 2015-08-24 07:27:24
In 2020 JSC "Aldanzoloto GRK" (included in the Polyus Gold Int.) plans to increase gold production up to 7 tons, CEO Aleksey Noskov states.
In order to increase ore processing "Aldanzoloto" reconstructs Kuranakh mine, performs revaluation of the reserves, local media reports.