UGMK to double extraction of copper-zinc ore at Buribaevsky GOK

​The expenditure of UGMK for the realization of the project of launching the “Yuzhny” bore at the Buribaevksy GOK amounted to over 1 bln roubles.

On July 18th the launch of the “Yuzhny” bore took place at the Buribaevky GOK of UGMK. The first lot of the copper-zinc ore is planned to be produced in mid 2016. The expenditure on the project’s realization made up over 1 bln roubles.

According to the company, the operation of the new bore will allow to double the productivity of the mine – to 400 thousand tons a year.

With the putting into operation of the bore the works are not over: the driftage of horizontal rocks, assembly of equipment at 5 sites and mining and preparatory works will be held.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer