Achinsk AR to supply all the products to the Krasnoyarsk AP.

By 2018 UC RUSAL plans to fully redirect the output of the Achinsk Alumina Refinery (AAR) for production needs of the Krasnoyarsk aluminium plant (KrAP). This decision will allow RUSAL to reduce the logistics costs by 45% and ensure KrAZ, consuming about 2 million tons of alumina, with the raw material from AAR.

In 2015 AAR is planning to supply KrAP with 745 thousand tons of alumina, which is 32% of the total alumina consumed by the plant. In 2016 the plant plans to increase the supply of alumina to KrAP to 752 thousand tons, while continuing further increase.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer