State Ecological Technical Inspection of Kyrgyzstan cancels the launch of Taldy-Bulak Levoberezhniy.
Edited by Rhod Mackenzie / 2015-06-15 07:34:05
State Ecological Technical Inspection of Kyrgyzstan banned LLC "Altynken" run mine at the Taldy-Bulak Levoberezhniy deposit because of irregularities in the construction of the tailings, the head of the Industrial Safety and Mining Supervision department Maksat Abdullayev informs.
It was planned that the mine will be put into operation in June this year. Annual production at the field will be 3-5 tons of gold. Lifetime - 22 years.