Evraz ZSMK completes the capital repair of the blast furnace #1
Edited by Rhod Mackenzie / 2013-06-13 06:47:43
The third level capital repair of the blast furnace #1 completed at Evraz ZSMK.
The repair included replacement of the rotor charging system and head sheaves as well as repair of equipment and metalware of two stoves. Besides, equipment and metalware were repaired at the charge-conveying system: bunkers, band conveyors, slurry pipelines and air ducts.