In the Q1 KNMP increases production by 15.3%.

In January- March 2014 Kirov Non-ferrous Metals Processing plant (KNMP, part of UGMK - NFMP) increased the output of rolled non-ferrous metals by 15.3 % compared to the same period in 2013.

56.7% of total production was brass rolled; 38.9 % for copper; for bronze and copper-nickel - 0.5 % and 3.9 %, respectively.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer