ChTPZ increases pipe production for oil and gas deposits
Edited by Anonymous / 2017-03-13 07:13:42
ChTPZ Group doubles the manufacture of tubing pipes with external upset from 18 to 35 thousand tons per year.
ChTPZ Group doubles the manufacture of tubing pipes with external upset from 18 to 35 thousand tons per year.
Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer