Tulachermet-Steel to start stable operation in 2017
Edited by Anonymous / 2015-02-13 06:18:27
The magazine “Metallosnabzheniye i sbyt” asked the vice-president for strategy and communications of the managing company Industrial-Metallurgical Holding S.Frolov at what stage the realization of an investment project on the territory of Tulachermet is.
- An investment construction project of a metallurgical plant of 1.5-2 million tons of liquid steel production capacity on the base of a converter plant, two-position ladle furnace, vacuum vessel, CC machine, two bar mills with reheating furnaces and wire block is realized in close proximity to Tulachermet.