New longwall face to be launched at mine n.a. Barakov in July

Krasnodonugol of Metinvest has prepared the fully-mechanized northern longwall face №17 at mine n.a. Barakov for operations. The deposits of the new longwall face are over 600 thousand tons of high-quality coking coal of the F grade. The launch is scheduled for July of this year.

Currently the installation of the mining equipment is being carried out. The length of the longwall face is 300 meters. Coal mining will be conducted at a depth of 756 meters.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer