Evraz constructs the main fan at Mezhegey deposit

​“Mezhegeyugol” coal company has started the construction of the main fan for air supply to the mine of the Mezhegey deposit. Land works have been held by today, basement has been constructed, the assembly of the equipment and elements of the building is held. The start-up and commissioning works are planned to be over in August 2015.

 The main fan is the unit which accepts air from the surface and supplies to under pressure to the mine at the volume of up to 200 cubic m/ second. The main fan will be in the structure of the ventilation complex along with the reserve fan.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer