Heap leaching has been resumed at Birkachan
Edited by Rhod Mackenzie / 2017-06-06 10:49:49
In 2017 it is planned to produce 125 kg of gold our of poor ore at the deposit.
In 2017 it is planned to produce 125 kg of gold our of poor ore at the deposit.
Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer