“Rudnik Vesely” reduced production by 30% in 2015
Edited by Rhod Mackenzie / 2016-07-05 06:21:22
OJSC “Rudnik Vesely” (part of a mining company “Siberia”) reduced gold production by 30% to 210.137 kg in 2015. It goes from the materials of the enterprise.
Silver production went down by 255 to 298.479 kg, copper in concentrate – by 305 to 169.135 tons. The revenue of the mine made up 564.283 million roubles, prime cost – 386.856 million, profit from sales – 127.715 million, net profit – 75.769 million roubles.