“Uskovskaya” hit an annual plan on coal production ahead of schedule

The mine “Uskovskaya” was the first in “Yuzhkuzbassugol” (part of EVRAZ), who fulfilled an annual production programme ahead of schedule and produced 2 million tons of coal.

To date, mining operation at “Uskovskaya” is carried out in Severnaya part of the layer 50. The GZh grade coking coal is produced from the long face No50-25. There produced 7.5 thousand tons of coal at the mine every day.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer