In H1, Almetyevsk pipe plant dispatched 128,000 tons of pipes
Edited by Rhod Mackenzie / 2014-08-04 09:18:47
In H1, the Almetyevsk pipe plant dispatched 128,000 tons of pipes (+7%), including 114,000 tons of pipes of its own production. The growth in production and dispatch is presupposed by the systematic improvement in efficiency and labour capacity, the CEO of the plant claims.