Chelyabinsk forge-and-pressing plant to supply a large shipment of flanges for construction of South Stream

The products of Chelyabinsk forge-and-pressing plant (ChKPZ) will be used for the construction of one of the most strategically important projects for Russia and Europe – the South Stream gas pipeline.

The negotiations with the new client started in spring. A company, which manufactures equipment for gas pipelines, ordered a large batch of high pressure flanges – a lot of them will be required in the construction of a number of South Stream’s facilities, as well as for the new branch of Nord Stream.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer