VMK “Krasny Oktyabr” to assemble new equipment at the metal-roll finishing workshop

New equipment, i.e. five 3-batches and hardening furnaces, will be assembled at the flat stock finishing workshop of the Volgograd metallurgical plant “Krasny Oktyabr”. Part of the equipment has already arrived, the press-service of the enterprise states.

“These furnaces mean high quality metal with mature mechanical characteristics for “Krasny Oktyabr”. The specialists of the plant started first assembly and wait for specialists of BOSIO (Slovenia), the supplier of the equipment, to carry out the installation. The assembly of equipment of the hardening shop and pre-commissioning procedures will start under their guidance. Trials start will take place in Q4, 2014,” is said in a plant paper of VMK.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer