New section has been launched at Raspadskaya mine
Edited by Rhod Mackenzie / 2016-06-01 03:07:04
Raspadskaya OJSC announces of the launch of a new section 5a-7-30 with the reserves of over 2.8 mln tons of coking coal of GJ mark. About 250 thousand tons of coal will be monthly extracted from this site. The 5a-7-30 section was put into industrial operation in conformity with the planned terms despite of difficult mining and geological conditions. In the framework of preparation a complex of dismantling, assembly and drifting works was held, with more than 9 thousand m of driftage. For a safe process of coal mining a preliminary degasification was held. The section is ventilated by the combined scheme with the help of the main fan.