In 2014 "Rimera" shipments volume for "Gazprom" to exceed 10 million Euros.
Edited by Rhod Mackenzie / 2014-03-31 06:25:54
The Czech Factory of the "Rimera", MSA groups will supply a batch of pipe fittings for the expansion of the Punginsk underground gas storage (UGS), OAO "Gazprom". In total in 2014 MSA will supply "Gazprom" with products worth over 10 million Euros.
According to the results of the tender procedures, the Czech factory "Rimera" MSA began producing a large batch of pipe fittings, which will include 535 ball valves with a diameter of 2"- 20", class 150 - 600. The fittings shipment is scheduled for April-May 2014. All products delivered to OAO "Gazprom", will be fitted with hydro pneumatic actuators.