The second power unit of Leningrad nuclear power plant reached 100% capacity after shutdown of turbine generator

On January 28, 2017 at 04:30 MSK the second power unit of the Leningrad nuclear power plant reached 100% capacity after a temporary shutdown of the turbine generator №3 day before.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer