Up to 92 mln roubles necessary for the exploration of missed layers in the south of Russia

The Subsoil Use Department in the South Federal District (under the supervision of Rosnedra) is looking for the executor of the state contract to find out the missed layers at the deposits and drilled sites of the undistributed fund of the South Federal District for their further use. It is planned to spend 92 mln roubles for this purpose.

According to the technical specification, the winner of the tender is to analyze the data on the research of wells of the undistributed subsoil fund and count the reserves of oil, gas and condensate at them as well as provide materials for the state expertise of reserves. Moreover, it is necessary to geological-geophysical models of perspective objects found out at the studied sites deeper than the drilled horizon and make geological reports, RIA Novosti reports.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer