Construction of West Chirag platform is almost completed

West Chirag platform will become the largest installation in the Caspian Sea. The topside (18.5 thousand tons) were founded in 2010 and the bearing block (18.2 thousand tons) was installed in April 2013. West Chirag will assist the stabilization of oil extraction at the block of Azeri-Chirag-Gyuneshli deposits and maximization of the reservoir recovery.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer