Construction of West Chirag platform is almost completed
Edited by Rhod Mackenzie / 2013-07-30 05:07:30
West Chirag platform will become the largest installation in the Caspian Sea. The topside (18.5 thousand tons) were founded in 2010 and the bearing block (18.2 thousand tons) was installed in April 2013. West Chirag will assist the stabilization of oil extraction at the block of Azeri-Chirag-Gyuneshli deposits and maximization of the reservoir recovery.