“Gazprom” starts transportation of equipment from “South Corridor” to “Nord Stream2”
Edited by Rhod Mackenzie / 2016-05-27 07:33:02
“Gazprom” uses technological equipment from “South Corridor”, which was to feed export Black Sea gas pipeline, at “Nord Stream2”.
As several sources in the sector stated to “Interfax”, there will be demounted half of blocks on gas dehydration at a compressor station “Kazachya” and transported to a compressor station Slavyanskaya, where Nord Stream 2 starts.