Expected oil production gain in Khanty-Mansiysk to make up appr.182 thousand tons
Edited by Rhod Mackenzie / 2013-03-27 06:32:01
OJSC “NAK “AKI-OTYR” increases its operational bore holes drilling rate. The operation is carried out within the frame of a drilling programme at the deposits of the joint-stock company.
The expected oil production gain at the expense of new bore holes launch will make up about 182 thousand tons of oil. There have been drilled 4 bore holes with an appliance of a large-volume hydraulic fracturing at a cluster pad No76 of the Verchne-Shapshinskoye deposit. An average launch debit at new wells made up 110 tons a day. Besides, there kept the operation on an arrangement of a well pad No15 and the drilling of the 1st well.