SOCAR engineers offshore platform at the Banka Darvina field
Edited by Rhod Mackenzie / 2014-02-27 10:45:21
SOCAR has started to engineer to fixed offshore platform №760 at the Banka Darvina field.
According to the company’s report, Neftqazelmlayihe SOCAR is engaged in the design. The general contractor of the construction will be Neftqaztikniti.
The platform, provides for the drilling of 10 operating wells, will be mounted at the depth of 9-9.5 meters. The expected daily yield from each well will make up 50 tons of oil