Construction of terminal for LNG production and loading in port of Vysotsk planned to start in March 2016

Construction of a terminal for production and transshipment of liquefied natural gas in the territory of the port of Vysotsk (Leningrad region) will begin in March 2016. This was reported by a source in the structures of Gazprom.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer