Loading of Serov metallurgic plant doesn’t exceed 75%

In January of 2014, production at the Serov metallurgic plant was decreased by 20% as compared with 2013. This led to necessity to optimize costs. The enterprise reported that decision on reduction of 196 employees was made because of this. In January, the plant produced 21 thousand tons of commercial rolled metal and calibrated steel that is by 20% less than in the same period of the previous year.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer