Loading of Serov metallurgic plant doesn’t exceed 75%
Edited by vadim / 2014-02-26 06:45:24
In January of 2014, production at the Serov metallurgic plant was decreased by 20% as compared with 2013. This led to necessity to optimize costs. The enterprise reported that decision on reduction of 196 employees was made because of this. In January, the plant produced 21 thousand tons of commercial rolled metal and calibrated steel that is by 20% less than in the same period of the previous year.