VSNK ahead of plan by operation drilling at Yurubcheno-Tokhoma deposit

​“East Siberia Oil and Gas company” OJSC (VSNK), an affiliate of Rosneft OJSC, on the results of 2014 completed the drilling of 7 operational wells at the Yurubcheno-Tokhoma deposit. The actual driftage in operational drilling exceeded 25 thousand m – ahead of plan. On the results of short-term tests of operational wells at the multi-well site #6 resulted in the fountain oil flow with the output of 395-470 tons a day, press service of Rosneft reports.

The program of geological exploration works for 2014 was completed in full: the appraisal well was drilled, 3D seismic exploration was held at the volume of 350 sq km.

The enterprise started to realize the gas program – in 2015 the drilling of gas injection wells for APG loading into the layer will be completed. The first stage of development presupposes the drilling of 5 wells. The plan was exceeded in the capital construction in 2014 as well – the program of putting into operation of the main assets was executed by 130%. 18 objects were put into operation instead of the planned 15.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer