ZapSibNeftekhim is 52.9% ready

The pyrolysis unit is 56.6% ready. On the construction site of the unit, the underground ground loop is being upgraded. More than 56 km of the grounding strip has been assembled.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer