ZapSibNeftekhim is 52.9% ready
Edited by Rhod Mackenzie / 2017-07-24 06:48:06
The pyrolysis unit is 56.6% ready. On the construction site of the unit, the underground ground loop is being upgraded. More than 56 km of the grounding strip has been assembled.