Eighteen bln roubles, spent for the “Southern Corridor” is a waster, mass media
Edited by Rhod Mackenzie / 2015-10-23 06:22:15
Oil and Gas Russia Southern Gas Corridor Nord Stream Nord Stream 2 South Stream Turkish Stream Gas Gazprom
Gazprom will transfer unwelded pipes, meant for the “South Stream” for the needs of “Nord Stream-2”. While the welded and arranged pipes at 18 billion roubles can not be used, Vedomosti writes.
The sources, close to pipe companies stated that “Gazprom” welded and laid down about 240 km of pipes from the planned 1625 km of the Eastern route of “Southern Corridor”.