Gazprom not to design the LNG plant for Shtokman

Gazprom dobycha shelf called off the request for proposals for the designing of the LNG plant for the second and the third phases of Shtokman gas condensate deposit.

The request was announced at the beginning of February 2013, the maximum contracted price made up 2.25 billion RUR with VAT.

It was decided to summarize the results no later than on April 5, though then the tender was postponed several times.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer