Rosneft creates new oil production centre of Uvat project on the basis of Protozanovskoye field
Edited by Rhod Mackenzie / 2015-05-22 11:26:05
Industrial production became possible as a result of large-scale technology projects on engineering preparation of field facilities, construction of wells and complex energy facilities, pipelines, winter and all-season roads, network of overhead power lines and other facilities of industrial and social infrastructure. The development drilling will be conducted from three well pads, the planned fund for drilling will be38 wells. It is expected that at the peak of the production the field will give about 1 million tons per year.