SOCAR designs a new platform for the Bulla Deniz field.

The daily debit of 4 wells on the platform number 6, designed for installation on the Bulla Deniz field, will be 2 million m3 of gas per year and 600 tons of gas condensate.

The platform will be based on a draft prepared by the Design Institute of SOCAR.

The platform will be installed at the point where the water depth is 26 m.

It will be on the balance of N.Narimanov’s oil and gas management.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer