Gazprom to look for ways to produce hydrocarbons in the Kara Sea: the monopoly announces tender for design of technical specification for offshore subsea production modules

Gazpom has announced tender for the design of the technical specifications for offshore subsea production modules. The results will be used by Gazprom during development of the perspective of deep water oil and gas fields on the shelf of the Kara Sea.

The complexity of the design consists in the absence of experience to use offshore subsea production modules with underwater preparation technology in conditions of limited navigation period (2-2.35 months). Besides, technical specification for offshore subsea production modules with productivity of up to 10 billion cubic meters will be designed for the first time in the domestic practice.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer