Severstal starts to dispatch pipes for Power of Siberia

Severstal has started the shipment of large diameter pipes, made by the Izhora pipe plant (a part of the Division Severstal Russian Steel) for the construction of the Power of Siberia gas transmission system.

The shipment is carried out within the framework of the obligations under the results of the first tender, which was held in June of the previous year.

The supplies include pipes with diameter of 1420 mm, made of steel of K60 grade with external and internal anti-corrosion coating, designed for the working pressure of 9.8 MPa. The first consignment in the volume of about 2 thousand tons has already been dispatched from the territory of the Izhora pipe plant and sent to the consumer.

Full text available to premium subscribers only.

Buy full access for 24 hours now


Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
42a Pushkina Street; Ufa, Bashkortostan 450076; Russia
E 54° 43.48836" N 55° 55.52346"
Telephone: +7 927 303 00 25

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer