The first hydraulic fracturing of formation carried out at the Novoport field, in Yamal

The first hydraulic fracturing of formation was successfully carried out at the Novoport field. The works were carried out in Jurassic sediments, which are characterized by high geological complexity, the Gazpromneft’s press centre reported.

On the whole, 5 operations of the hydraulic fracturing of formation took place: single hydraulic fracturing in vertical wells and multi-stage in the horizontal well.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer