SOCAR starts drilling two wells in the "Bank of Darwin" field.

SOCAR has started drilling two new wells in the "Bank of Darwin" field. The work is commissioned by the Trust of complex drilling works oil and gas production department of "Absheronneft".

The design depth of the well number 738, which will be drilled from the platform number 740, is 940 meters and of the well number 839, where the drilling operations will be conducted from the platform number 720 - 1425 meters.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer